Government buyer
Companies awarded contracts by Mbale District Local Government
Mbale District Local Government is a public buyer in Uganda's official open-contracting data. It has published 196 contract awards to 133 suppliers, worth UGX 11.3B in disclosed value across 2020–2024.
196
Awards published
133
Suppliers
UGX 11.3B
Disclosed value
2020–2024
Active years
Suppliers
Top suppliers to Mbale District Local Government
The companies that won the most contracts from this buyer. Registry-verified suppliers link to their company page; unverified vendors to their procurement record.
- 7 awards · 188M
- 6 awards · 52.5M
- 5 awards · 101M
- 5 awards · 98.4M
- 5 awards · 89.9M
- 5 awards · 72.4M
- 4 awards · 44.8M
- 3 awards · 1.5B
- 3 awards · 223M
- 3 awards · 206M
Timeline
Awards by year
Awards
Individual contract awards
- UGX 731M
Construction of Maumbe Mukhwana Vocational Institute in Bungokho sub-county
9 July 2020
- UGX 688M
Construction of retaining wall works at Bubenstye Seed School
26 April 2022
- UGX 556M
Construction of two Dormitories two five stance lined pit latrines and four units of open showers at Maumbe Mukwana Memorial Technical institute in Mbale District
1 July 2021
- UGX 440M
Construction of New Bubyangu- Bufumbo Gravity Flow Scheme
14 December 2023
- UGX 431M
Construction of gravity flow scheme (GFS)
12 July 2021
- UGX 425M
Construction of New Bubyangu - Bufumbo Gravity Flow Scheme Phase 11
27 April 2022
- UGX 365M
Construction OPD at Kama Health Centre Three in Bufumbo Sub-county
2 February 2023
- UGX 345M
construction of classroom blocks, OPDs and Staff Houses in various schools and Health Centres in the District
7 January 2021
- UGX 312M
construction of OPD 3 stance pit latrine , solar power, watse medical kit and incinerator in lwasso
9 July 2020
- UGX 303M
Construction of Bubyangu - Bufumbo Gravity Flow Scheme Phase three
3 February 2023
- UGX 280M
Supply and Delivery of Equipment for Presidential Pledge for Maumbe Mukhwana Memorial Institute
14 December 2023
- UGX 246M
construction of Two classrooms 1&2 , a five stance lined pit latrine for girls, 72 three seater desks and four sets of teachers furniture for Bushikori Primary School
29 April 2022
Show 184 more awards ↓Hide additional awards ↑
- UGX 200M
Design, supply and installation of micro scale irrigation systems. lot 1
29 January 2024
- UGX 195M
Design, supply and installation of micro scale irrigation systems. lot 2
29 January 2024
- UGX 192M
Construction of buildings
8 January 2021
- UGX 190M
Construction of a 4 classroom Block at Busabulo Primary School
3 January 2024
- UGX 185M
Construction of a four classroom Block at Bunawire Primary School Wanale sub-county
19 March 2020
- UGX 180M
construction of classroom blocks, OPDs and Staff Houses in various schools and Health Centres in the District
8 January 2021
- UGX 180M
Construction of four classroom Block at Bushiuyo Primary School in Budwale sub-county
9 July 2020
- UGX 166M
construction of classroom blocks, OPDs and Staff Houses in various schools and Health Centres in the District
7 January 2021
- UGX 157M
Construction of a 3 classroom Block at Jewa Primary School
3 January 2024
- UGX 137M
construction of classroom blocks, OPDs and Staff Houses in various schools and Health Centres in the District
7 January 2021
- UGX 136M
Rehabilitation of 25 boreholes in various Sub-counties
3 May 2024
- UGX 133M
sitting, drilling. castting pump testing and installation of 7 bore holes in various subcounties
9 July 2020
- UGX 128M
Rehabilitation of bore holes
7 January 2021
- UGX 125M
Rehabilitation of 33 boreholes in Mbale District Local Government
11 May 2022
- UGX 120M
Supply of Equipment for Establishment of Demonstration Sites for UGIFT Microscale Irrigation Program
15 July 2021
- UGX 116M
Construction of pit latrines
8 January 2021
- UGX 115M
construction of classroom blocks, OPDs and Staff Houses in various schools and Health Centres in the District
7 January 2021
- UGX 113M
Construction of boreholes
7 January 2021
- UGX 96.7M
Sitting, drilling, casting pump testing and installation 5 bore holes in various sub-counties in mbale
9 July 2020
- UGX 89.8M
Rehabilitation of 33 bore holes in various sub-counties
7 July 2020
- UGX 87.3M
Supply of cassava cuttings to production department
2 July 2020
- UGX 86.4M
Completion of a 3 classroom block at Bufumbo Primary School
9 July 2020
- UGX 77.8M
Completion of two classroom Block and Headteachers office at Rongoro Primary School
29 April 2022
- UGX 76.0M
Procurement of survey equipment under Natural Resources Department in Mbale District
12 July 2021
- UGX 73.0M
Sitting, drilling, pump testing and installation of three boreholes in Mbale District
2 February 2023
- UGX 71.2M
Construction of a Fence at Kimwanga Market
7 July 2020
- UGX 67.3M
Renovation of a two Classroom at Lwangoli Primary School
19 July 2021
- UGX 66.2M
Renovation of three classroom block at Mulatsi
2 July 2020
- UGX 66.0M
Construction of 5 stance lined pit latrines at (Lwaboba, Nasyera, Naiku, Busoba, and Bubentsye primary schools)
3 January 2024
- UGX 63.7M
Sitting, Drilling Pump testing and installation of 3 boreholes in Mbale District
28 April 2022
- UGX 60.0M
Survey, Design and Documentation of New Bubyangu - Bufumbo GFC
9 July 2020
- UGX 58.0M
Supply and installation of solar panels and water pump to Nakaloke Health Centre in Nakaloke Town Council
7 July 2020
- UGX 54.3M
Procurement of 22 in-calf dairy heifers to Bumasikye and Busiu
2 July 2020
- UGX 53.8M
Renovation of classroom block at Bumbobi Primary School in Bumbobi S/C
9 July 2020
- UGX 53.8M
Renovation of 2 classroom block at Bulweta primary school in Bukonde
7 July 2020
- UGX 49.8M
Rehabilitation of 15 Boreholes in various Sub-Counties
12 July 2021
- UGX 48.7M
Survey Design and Documentation of Nakaloke Solar Pumped water system
9 July 2020
- UGX 48.1M
Rehabilitation of 15 Boreholes in various sub-counties in Mbale District
3 February 2023
- UGX 47.6M
Renovation of a two Classroom Block at Busiu Primary School
8 July 2020
- UGX 38.9M
Rehabilitation of Budwale Gravity Flow Scheme
10 February 2023
- UGX 38.1M
Rehabilitation of boreholes in Mbale
8 July 2020
- UGX 37.8M
Supply of 250 three seater classroom Desks to Education Department
3 February 2023
- UGX 35.7M
Supply of six motorcycles to Health Department in Mbale District
28 April 2022
- UGX 35.0M
Collection of revenue from Muwanga livestock market
19 October 2023
- UGX 28.5M
construction of 3 stance lined pit Latrines in Budwale RGC and Kimwanga Market
4 January 2024
- UGX 27.8M
Renovation of marternity ward in Nakaloke town council
6 July 2020
- UGX 27.6M
Supply of beehives and bee suites to production department
6 July 2020
- UGX 27.5M
Expansion and Fencing of Jewa Slaughter Slab In Jewa Town Council
29 January 2024
- UGX 27.3M
supply of 11 calf heifers to Bukasakya S/C in Mbale district local government.
18 March 2020
- UGX 25.9M
Construction of Five stance Lined Pit Latrines on various primary schools in Mbale District
24 February 2023
- UGX 25.8M
Protection of Nakikameri Spring in Lwasso Sub-county
14 July 2021
- UGX 25.7M
Construction of Five stance Lined Pit Latrines on various primary schools in Mbale District
24 February 2023
- UGX 25.6M
Construction of Five stance Lined Pit Latrines on various primary schools in Mbale District
10 February 2023
- UGX 25.6M
Construction of Five stance Lined Pit Latrines on various primary schools in Mbale District
27 February 2023
- UGX 25.4M
Supply of in-calf Heifers to Bubyangu and Budwale sub-counties in Mbale District
16 June 2021
- UGX 25.3M
Construction of Five stance Lined Pit Latrines on various primary schools in Mbale District
27 February 2023
- UGX 24.8M
procurement of open diary Heifers to Bubyangu Sub-county
7 July 2020
- UGX 24.4M
Construction of a 5 stance lined pit latrine at Kilayi P/s in Bubyangu S/C
8 July 2020
- UGX 24.3M
Construction of Three stance lined pit Latrine at the Rural Growth Centres of SAlem and Kolong in Nambasa Sub-county
5 July 2021
- UGX 24.2M
Construction of 3 stance lined pit latrine in Nkungu Nanibi (Bubyangu) and bukhulenga (bungokho subcounty) for mbale district local government
26 April 2022
- UGX 24.1M
Construction of Five stance Lined Pit Latrines on various primary schools in Mbale District
10 February 2023
- UGX 24.1M
Construction of Five stance Lined Pit Latrines on various primary schools in Mbale District
10 February 2023
- UGX 24.1M
Construction of Five stance Lined Pit Latrines on various primary schools in Mbale District
27 February 2023
- UGX 24.0M
Construction of Five stance Lined Pit Latrines on various primary schools in Mbale District
10 February 2023
- UGX 23.9M
Construction of Five stance Lined Pit Latrines on various primary schools in Mbale District
27 February 2023
- UGX 23.7M
Supply of spray pumps ,pesticides,fungicide,potato vines and climbing beans to production department
21 April 2022
- UGX 23.7M
construction of a 5 stance lined pit latrine at Jewa primary school
28 April 2022
- UGX 23.6M
Construction of five stance lined pit Latrine at Buwamwangu Primary School
8 July 2020
- UGX 23.4M
Supply of laptops, desktops and digital camera to management, administration and lukhonje sub-county
7 July 2020
- UGX 23.3M
Supply of tomato and climbing seeds to production department in Mbale District Local Government
13 July 2021
- UGX 23.1M
Construction of a 5 stance lined pit latrine at Makunda P/S in Bumasikye s/c
8 April 2020
- UGX 22.8M
Construction of 2 -3 stance lined pit latrines in Kaama and Bukeide RGCs
8 July 2020
- UGX 22.7M
Construction of 5 stance lined pit latrine at Lwambogo P/s in Bungokho s/c
8 April 2020
- UGX 22.4M
Construct of a five stance Lined Pit Latrine at Mulatsi Primary School in Bukiende Sub-county
7 July 2020
- UGX 22.2M
Construction of a five stance lined pit latrine at bunambutye primary school
28 April 2022
- UGX 22.1M
Construction of a five stance Lined Pit Latrine at Bumbobi Primary School
8 April 2020
- UGX 22.1M
Construction of 5 stance lined pit latrines to various primary schools in Mbale District
19 March 2020
- UGX 22.1M
Construction of a 5 stance lined pit latrine at Namatsale P/s in Bungokho S/C
7 July 2020
- UGX 22.0M
Supply of Desktop, Laptop Computers, Printers and Camera Lens to Administration Department
19 July 2021
- UGX 21.8M
Construction of a 5 stance pit latrine at Nambozo P/s in Nakaloke S/C
8 April 2020
- UGX 21.7M
Construction of 5 stance lined pit latrine in Bukasakya S/C
8 July 2020
- UGX 21.2M
Construction of a 5 stance lined pit latrine at Nanyunza P/s in Bukonde s/c
8 April 2020
- UGX 20.8M
Construction of a 5 stance pit latrine at Nakaloke P/s in Nakaloke T/C
8 April 2020
- UGX 20.5M
Supply of Agricultural inputs for establishment off demonstration sites for UGIFT Micro-scale Irrigation program
19 July 2021
- UGX 20.4M
Supply of groundnuts to Busiu sub-county in Mbale District Local Government
17 June 2021
- UGX 19.5M
Procurement of 78 pigs 3 month grower to production department
21 April 2022
- UGX 17.9M
Supply of ktbs honey refracto, meter and pyramidal tsetse fly trap
22 April 2022
- UGX 17.6M
Supply of groundnuts to Busiu Sub-county
19 March 2020
- UGX 17.6M
Supply of fish fingering ,floating fish feeds ,cage and canoe to production department
22 April 2022
- UGX 17.5M
Rehabilition of bumbobi , gravity flow scheme in mbale district
22 April 2022
- UGX 17.4M
Supply of 2 liquid Nitrogen Tank, Bovine Semen straws and surgical kit for large animals to production
6 July 2020
- UGX 17.0M
Procurement of Horticultural seeds, Pesticides and fungicides to Bungokho Mutoto sub-county
19 March 2020
- UGX 16.8M
Supply of Horticultural seeds, Fertilizers Fungicides to Busiu and Bungokho sub-county
18 March 2020
- UGX 16.4M
Supply of Female and Male Piglets to Bumasikye sub-county
16 June 2021
- UGX 15.8M
Procurement of Male and Female goats to Buisu sub-county in Mbale District
16 June 2021
- UGX 15.8M
Construction of three stance Lined Pit Latrines in Bulusambu RGC in Busiu Sub-county
10 February 2023
- UGX 15.7M
Supply of 26 pigs and 102 plglets to Bungokho and lukhonje sub-county
7 July 2020
- UGX 15.5M
supply of manual coffee pulpers to production department
4 January 2024
- UGX 15.1M
Supply of bee hives to Bungokho Sub-county
7 July 2020
- UGX 15.0M
supply of assorted solar materials to health centres in mbale distric
26 July 2022
- UGX 14.9M
Construction of three stance lined pit latrine at Wanale Health Centre 111
22 July 2022
- UGX 13.3M
supply of ground nuts seeds serenuts,soya beans seeds and rice seeds at Bukasakya S/C
19 March 2020
- UGX 13.3M
Supply of onions and Ground nuts to Busano Sub-county
7 July 2020
- UGX 13.2M
supply of KTB hives and bee suits to production Department
3 January 2024
- UGX 13.0M
supervision for sitting ,drilling, pump testing and installation of 12 boreholes in Mbale district local government.
18 March 2020
- UGX 12.7M
Supply of Horticulture Seeds To Bungokho Sub-county
16 June 2021
- UGX 12.5M
procurement of onion seeds,fertilizer,cabbage seeds to Bubyangu and Budwale sub-county.
18 March 2020
- UGX 12.4M
Procurement of Kroiler Birds and grower Mash and chick mash to Bungokho - Mutoto Sub-county
19 March 2020
- UGX 11.9M
Procurement of lumpy skin diseases vaccins to production department
21 April 2022
- UGX 11.7M
Construction of 2 stance lined pit latrine at Bumasikye sub county
28 April 2022
- UGX 11.7M
Rehabilitation of Namanyonyi and Nasekhe Gravity flow Schemes
16 June 2021
- UGX 11.6M
siting, drilling, pump testing and installation of boreholes
13 November 2023
- UGX 11.4M
Contruction of Slaughter Slab in Nakaloke TC
8 July 2020
- UGX 11.0M
procurement of irrigation pump to Nakaloke sub-county
8 July 2020
- UGX 11.0M
Supply of motorcycle to health department
7 July 2020
- UGX 10.7M
Supply of oil crop seeds to Bungokho sub-county in Mbale District
16 June 2021
- UGX 10.7M
Supply of ground nuts and pesticides to lukhonge
6 July 2020
- UGX 10.5M
Supply of pigs growers to production Department
3 February 2023
- UGX 10.0M
Supply of Desktop computer and printer to Jewa Town Council and Desktop computer and Tablet computer to Water Department
22 July 2022
- UGX 10.0M
supply of 40 grower pigs to production Department
3 January 2024
- UGX 9.9M
Supply and installation of water harvester tank and motorized irrigation pump to Bukasakya Sub-county
6 July 2020
- UGX 9.6M
Rehabilitation of Gravity Flow Scheme in Busoba Sub-county
8 July 2020
- UGX 9.5M
Supply of manual coffee pulpiers to Production Department
3 February 2023
- UGX 9.4M
Supply of spray pumps and onion seeds to Lwasso Sub-county
18 March 2020
- UGX 9.4M
Supply of Bee Suites to Entomology Sub-sector under production Department in Mbale District
30 June 2021
- UGX 9.3M
Supply and Installation of Street Light system to Nauyo - Bugema Town Council
18 March 2020
- UGX 9.2M
Supply of in-calf Heifers to Busano
6 July 2020
- UGX 9.1M
Supply of classroom desks
14 July 2021
- UGX 9.0M
Supply of chicks to sub-counties in Mbale District
17 June 2021
- UGX 9.0M
Supply of Piglets to Bukiende Sub-county
15 July 2021
- UGX 8.9M
Rehabilitation of three spring wells in bukiende sub county
26 April 2022
- UGX 8.9M
Procurement of fish fingerings and fish feeds to production department
6 July 2020
- UGX 8.6M
Supply of horticulture seeds and spray pumps to Bukonde sub-county
8 July 2020
- UGX 8.4M
supply of two laptop computer to health department in mbale district
26 July 2022
- UGX 8.4M
Construction of a 2 stance lined pit latrine at Bufumbo HCIV in Bukonde Sub-county
18 March 2020
- UGX 8.2M
Supply of office furniture to Jewa Town Council and Water department
22 July 2022
- UGX 8.2M
Supply of soya beans, groundnuts and Rice seeds to Bukasakya Sub-county in Mbale District
5 July 2021
- UGX 8.1M
Supply of Laptop computers, printer and Ipad to production department
28 April 2022
- UGX 8.0M
Supply of steel bicycles under transactional development to the district
8 July 2020
- UGX 7.8M
Construction of a slaughter slab at Bukasakya Sub-county
8 July 2020
- UGX 7.7M
Procurement of 2 irrigation pumps to Bukonde
8 July 2020
- UGX 7.7M
supply of office furniture to production department in mbale district
26 July 2022
- UGX 7.6M
Protection and reconstruction of Spring wells in Bukonde Sub-county
12 July 2021
- UGX 7.4M
Supply of Horticultural seeds and spray pumps to Namanyonyi Sub-county
7 July 2021
- UGX 7.4M
Supply of Uzima and Concentrates to Namanyonyi sub-county in Mbale District
7 July 2021
- UGX 7.2M
Supply of Fish Fingerling and floating fish feeds to Production Department
3 February 2023
- UGX 7.2M
Supply of horticulture seeds to Bukaskya Sub-county
6 July 2020
- UGX 7.0M
supply of 2 laptop computers and 1 printer to production department
3 January 2024
- UGX 7.0M
Supply of oil foundation seeds, groundnuts and soya Beans to Bungokho sub-county
19 March 2020
- UGX 6.7M
Supply of Horticultural Seeds to Bubyangu Sub-county
27 May 2021
- UGX 6.4M
Supply of horticulture seeds to Namabasa sub-county
8 July 2020
- UGX 6.4M
supply of floating fish feeds and fish fingerlings
3 January 2024
- UGX 6.3M
Spply of maize seed to Bumasikye sub-county in Mbale District
23 April 2021
- UGX 6.1M
Supply of groundnuts to Nakaloke sub-county
19 July 2021
- UGX 6.0M
Supply of spray Pumps, Tomato and Onion Seed to Bukonde Sub-county in Mbale District
16 June 2021
- UGX 6.0M
Supply of desk tops,laptops and computer accessories
1 July 2021
- UGX 5.8M
supply of fish pond csein and fry net to production
8 July 2020
- UGX 5.6M
Supply of ground nuts to Nakaloke sub-county
6 July 2020
- UGX 5.5M
Rehabilitation of Spring Wells in Bukonde Sub-county
18 March 2020
- UGX 5.3M
Supply of settling tanks and harvesting gears to production Department
3 February 2023
- UGX 5.3M
Construction of Springs of Kayembe and Kironde in Namanyonyi Sub-County
12 July 2021
- UGX 5.1M
Supply of cabbage and tomato seed to Bukasakya Sub-county in Mbale District
16 June 2021
- UGX 4.9M
Supply of field kits to production department
28 April 2022
- UGX 4.6M
Supply of horticulture seeds to Namanyonyi sub-county
6 July 2020
- UGX 4.4M
Rehabilitation of Spring Wells in Bukonde Sub-county
18 March 2020
- UGX 4.2M
Construction of Medical Waste Pit at Bunampongo Health Centre 111
26 July 2022
- UGX 4.0M
collection of revenue from Bubyangu Wampewo Market
19 October 2023
- UGX 4.0M
collection of revenue from Bubyangu Wampewo Market
19 October 2023
- UGX 4.0M
Supply of LCD Projector screen and connected Dstv for three Months to production Department
3 February 2023
- UGX 3.9M
Supply of filling Cabinets to Health Department in Mbale District
16 June 2021
- UGX 3.9M
Supply of piglets to Bungokho sub-county in Mbale District
12 July 2021
- UGX 3.8M
Supply of tomato seeds to Lwasso sub-county
15 July 2021
- UGX 3.5M
Supply of Pullets and Cockrels to Bukonde Sub-county in Mbale District
16 June 2021
- UGX 3.0M
Construction of Wambululu spring well in Busoba Subcounty
22 July 2022
- UGX 3.0M
supply of One laptop to Procurement and Disposal Unit
4 January 2024
- UGX 2.7M
Protection of Kipafu Spring well in Bufumbo Sub-county
18 March 2020
- UGX 2.7M
Supply of pullets and cockrels to Bukonde S/C
8 July 2020
- UGX 2.6M
Supply of fish fingerings and inputs
1 July 2021
- UGX 2.4M
construction of kigere spring well in bufumbo sub county
26 July 2022
- UGX 2.2M
Supply of Irrigation pumps to Bukiende Sub-county
15 July 2021
- UGX 1.1M
collection of revenue from Bukikoso Makyese Market
19 October 2023
- UGX 800K
collection of revenue from Basano Slaughter Slab
19 October 2023
- UGX 800K
collection of revenue from Busano Market
19 October 2023
- UGX 600K
collection of revenue from Busoba Market
19 October 2023
About this page
Built from Uganda's official open-contracting (OCDS) publications. Award counts and values reflect what the buyer disclosed at publication time; contracts awarded but not published are not shown. Buyer names are normalized for display, the source string is preserved on each record. Data refreshed 26 July 2026.